*Baldwin Road/Clarkston Road Roundabout | Baldwin Road/Clarkston Road intersection | Orion Township | Construction of a roundabout that includes asphalt paving, Americans with Disabilities Act-compliant crosswalks connecting to existing pathways, roundabout lighting, drainage improvements and High-Intensity Activated CrossWalks (HAWK) beacons at Baldwin Rd crossings. | Yes. Access to businesses, homes and the park near and at the intersection will be maintained. Baldwin Ct/W Baldwin will open temporarily during construction to provide more direct access. | For Baldwin Rd and Clarkston Rd detours, visit https://www.rcocweb.org/675/Baldwin-RoadClarkston-Road-Roundabout | Walter Toebe, LLC | June, TBA (for the intersection closure) | Late summer, TBA | Baldwin Road/Clarkston Road Roundabout |
Brown, Giddings and Silver Bell roads | M-24 (Lapeer Road) to Jamm Road | Auburn Hills and Orion Township | Pavement removal, asphalt paving, widening on Brown Rd, drainage improvements, traffic signal installation/modernization, side street and driveway approach reconstruction, new guardrail and pavement markings. | Silver Bell Rd remains open with one lane in each direction. There will be separate closures of Brown Rd and Giddings Rd. Dates will be announced. | The detour will be announced for separate closures of Brown Rd and Giddings Rd. | Dan's Excavating | 4/16 | Mid-November | Brown, Giddings and Silver Bell roads |
*Davisburg Road/Broadway Road (PERMIT PROJECT) | Andersonville Road to Hickey Avenue | Springfield Township | Mill Pond dam removal project continuation that includes asphalt paving, new guardrail and storm sewer work. | The road is closed. | The detour is Andersonville Rd to White Lake Rd to Dixie Hwy, back to Davisburg Rd/Broadway Rd and vice versa. | Anglin Civil, on behalf of Springfield Township and Oakland County Parks and Recreation | 5/13 | Mid-June | Davisburg Road/Broadway Road (Mill Pond/Dam Removal) |
Dequindre Road (PERMIT PROJECT) | Hamlin Road to Avon Road | Rochester Hills and Shelby Township | Great Lakes Water Authority 96-inch water transmission pipe installation, reconstruction of Dequindre Road and replacement of the Honeywell Ditch culvert with a concrete structure. | Yes, business and residential access maintained. | Hamlin Rd to John R Rd to Avon Rd, back to Dequindre Rd and vice versa. | Ric-Man Clark Joint Venture on behalf of the Great Lakes Water Authority | 11/6/23 | Late November | Great Lakes Water Authority |
Duck Lake Road
| North of Highland Road (M-59) to Wardlow Road
| Highland Township
| Remove and replace a culvert under the road. The culvert is located just south of Orchard Court.
| No
| No
| RCOC Highway Maintenance
| 5/11
| COMPLETE | Permit Work & Short-Term Road Closures |
Farr Street Bridge | Broadway Street to Elkin Street | Commerce Township | Remove the bridge that carries the Huron River. Work also includes asphalt paving in the vicinity of the bridge, drainage improvements, new pathway access to Mill Race Park and new curbs and gutters. | Yes. Residential, park and business access maintained east and west of the culvert replacements. | Carroll Lake Rd to West Commerce Rd to North Commerce Rd, back to Farr St and vice versa. | C.A. Hull | 6/10 | 8/23 | Farr Street Bridge |
Grand River Avenue | Napier Road to Wixom Road | Lyon Township and Wixom | Grinding pavement, resurfacing with asphalt, some reconstruction, installation of a continuous center left-turn lane between Napier and 12 Mile, traffic signal upgrades, Americans with Disabilities Act-compliant crosswalks and some road shoulder paving. | Two-way traffic is maintained on Grand River Ave. | No. | Fonson | 4/1 | Late August | Grand River Avenue, Napier to Wixom Road |
Napier Road at Grand River Avenue (part of the Grand River Avenue, Napier to Wixom Road project) | Napier Road at Grand River Avenue | Wixom and Lyon Township | Intersection construction that is part of the Grand River Ave, Napier to Wixom Rd, project. | Napier Rd is closed at Grand River Ave until late May. Grand River Ave remains open to two-way traffic. | Grand River Ave to Beck Rd to Ten Mile Rd, back to Napier Rd and vice versa. | Fonson | 4/29 | Late May | Grand River Avenue, Napier to Wixom Road |
Indianwood Road Culvert Replacement | Lapeer Road (M-24) to Joslyn Road | Orion Township | Utility relocation work, upgrades to township water and sewer infrastructure, replacement of the culvert under the road that carries Paint Creek, storm sewer improvements and asphalt paving over the vicinity of the culvert. | Yes, the road is closed between Abseguami Trl and Fernhurst Dr. | Joslyn Rd to Clarkston Rd to Lapeer Rd, back to Indianwood Rd and vice versa. | Dan's Excavating | 1/16 | 10/5 | Indianwood Road Culvert Replacement over the Paint Creek |
Long Lake Road Culvert Replacement | Eastways Road to Squirrel Road (culvert is just east of Eastways Road) | Bloomfield Hills | Remove and replace the culvert under the road that carries the Rouge River. The work also includes paving in the vicinity of the culvert, new signage, guardrail and pavement markings. | Yes, the road will close just east of Eastways Rd. Residential and business access maintained east and west of the road closure. | Long Lake Rd to Squirrel Rd to Square Lake Rd (just south of I-75 Business Loop/Square Lake Rd) to Eastways Rd, back to Long Lake Rd and vice versa. | DiPonio Contracting | June, TBA | August, TBA (once Long Lake Rd reopens to traffic, the contractor will close Eastways Rd, just north of Long Lake Rd, to remove and replace the second culvert). | Long Lake Road and Eastways Road Culvert Replacements |
*Pontiac Lake Road Bridge Replacement over the Clinton River | Airport Road and Crescent Lake Road (between Irwin Drive and North Pine Grove Avenue) | Waterford Township | Remove and replace the structure over the Clinton River. The project includes a new pre-cast concrete culvert, headwalls, wing walls, watermain relocation, storm sewer upgrades, pedestrian access improvement and asphalt paving in the vicinity of the bridge. | Yes, Pontiac Lake Rd is closed to vehicle and pedestrian traffic between Irwin Dr and North Pine Grove Ave. Pedestrian and business access maintained east and west of the bridge work. | Airport Rd to Highland Rd (M-59) to Crescent Lake Rd, back to Pontiac Lake Rd and vice versa. | Z Contractors Inc. | 5/8 (closed due to a hole in the bridge deck; the bridge will remain closed for replacement) | 10/18 | Pontiac Lake Road Bridge Replacement over the Clinton River |
Preservation Overlays (Simple Resurfacing/Short-Term Paving) | The work will be done on just over 46 miles of heavier-traveled roads. | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; work is weather-dependent. | No, expect traffic delays. Roads are expected to remain open with flaggers directing traffic. | No. | No. | Cadillac Asphalt | 4/22 | TBA | Simple Resurfacing (Preservation Overlays) |
Southfield Road | 11 Mile Road to 12 Mile Road | Lathrup Village | Resurfacing project that includes removing the road surface, paving with asphalt, reconstructing some side street approaches, crosswalk improvements, traffic signal modernization at some intersections and extensive intersection construction work. | Southfield Rd will mostly remain open to two-way traffic; expect weekend closures of the 12 Mile Rd/Southfield intersection. The west half of 11 Mile Rd/Southfield Rd intersection and I-696 ramps to Southfield Rd are closed until May 24. | For pending detours and intersection full or partial closures information, visit https://www.rcocweb.org/680/Southfield-Road-11-Mile-Road-to-12-Mile- (business access maintained) | Ajax paving | 4/29 | Early summer | Southfield Road, 11 Mile Road to 12 Mile Road |
Spot Resurfacing | Various heavier traveled roads throughout Oakland County. | Milling (grinding) pavement on roads and paving with asphalt. The work is weather-dependent. | No, expect traffic delays. Roads are expected to remain open with flaggers directing traffic. | No. | No. | Florence Cement Company | 4/22 | TBA | Spot Resurfacing |
Waldon Road (PHASE 2) | Just east of Montclair Drive to Clintonville Road | Independence Township and Orion Township | The remaining work includes gravel-road paving with asphalt, replacement of a culvert just east of Clintonville Rd, paving road shoulders and realignment of curves to improve safety. | Yes, Waldon Rd is closed to through traffic. | Waldon Rd to Baldwin Rd to Clintonville Rd, back to Waldon Rd and vice versa. | Dan's Excavating | 3/8 | Mid-October | Waldon Road, Clintonville to Baldwin Road |
Waldon Road and Clintonville Road roundabout construction (part of the Waldon Road-PHASE 2 project) | Waldon Road/Clintonville Road intersection | Independence Township | Construction of a roundabout at the Waldon Road/Clintonville Road intersection, asphalt paving, culvert replacement and stream realignment. | Yes, starting approximately July 1. | Waldon Rd to Baldwin Rd to Maybee Rd to Sashabaw Rd to Clarkston Rd, back to Clintonville Rd and vice versa. | Dan's Excavating | 7/1 (expected start) | Mid-October | Waldon Road, Clintonville to Baldwin Road |
Walton Blvd. | Adams Road to just east of Livernois Road | Rochester Hills | Removing pavement, paving with asphalt, culvert replacement, minor storm sewer improvements, Americans with Disabilities Act-compliant sidewalk ramps, concrete curb and gutter repairs. | Walton Blvd will have one lane open in each direction throughout construction. Business and residential access maintained. | No. | Pro-Line Asphalt | 4/15 | Mid-August | Walton Blvd., Adams to Livernois Road |