*12 Mile Road, Eastbound (PERMIT PROJECT) | Guy Street to Southfield Road | Lathrup Village and the City of Southfield | Southeastern Oakland County Water Authority (SOCWA) utility work. | Yes, eastbound 12 Mile Rd will close from Guy Street to Southfield Rd. | Eastbound traffic detour is Evergreen Rd to 11 Mile Rd/ I-696 Service Drive back to Southfield Rd. | SOCWA | 4/13 | 4/14 (evening) | SOCWA |
Brown, Giddings and Silver Bell roads | M-24 (Lapeer Road) to Jamm Road | Auburn Hills and Orion Township | Pavement removal, asphalt paving, widening on Brown Rd, drainage improvements, traffic signal installation/modernization, side street and driveway approach reconstruction, new guardrail and pavement markings. | Silver Bell Rd will remain open with one lane in each direction. There will be separate closures of Brown Rd and Giddings Rd. Dates will be announced. | The detour will be announced for separate closures of Brown Rd and Giddings Rd. | Dan's Excavating | 4/16 | Mid-November | Brown, Giddings and Silver Bell roads |
Davisburg Road/Broadway Road (PERMIT PROJECT) | Andersonville Road to Hickey Avenue | Springfield Township | Mill Pond dam removal, channel restoration, culvert installation and asphalt paving. | The road is temporarily open to traffic. | The road will close again in the spring, date TBA. The detour will be Andersonville Rd to White Lake Rd to Dixie Hwy, back to Davisburg Rd/Broadway Rd and vice versa. | Anglin Civil, on behalf of Springfield Township | 10/2/23 | The road temporarily reopened to traffic on March 12 (the road will close again in the spring for asphalt paving and Mill Pond work, a date will be announced) | Davisburg Road/Broadway Road (Mill Pond/Dam Removal) |
Dequindre Road (PERMIT PROJECT) | Hamlin Road to Avon Road | Rochester Hills and Shelby Township | Great Lakes Water Authority 96-inch water transmission pipe installation, reconstruction of Dequindre Road and replacement of the Honeywell Ditch culvert with a concrete structure. | Yes, business and residential access maintained. | Hamlin Rd to John R Rd to Avon Rd, back to Dequindre Rd and vice versa. | Ric-Man Clark Joint Venture on behalf of the Great Lakes Water Authority | 11/6/23 | Late November | Great Lakes Water Authority |
Grand River Avenue | Napier Road to Wixom Road | Lyon Township and Wixom | Grinding pavement, resurfacing with asphalt, some reconstruction, installation of a continuous center left-turn lane between Napier and 12 Mile, traffic signal upgrades, Americans with Disabilities Act-compliant crosswalks, and some road shoulder paving. | Two-way traffic is maintained on Grand River Ave. Napier Rd will close at Grand River Ave for reconstruction; the date will be announced. | Yes, Napier Rd will close at Grand River Ave for reconstruction. Once closed, the detour is Napier Rd to Ten Mile Rd to Beck Rd, back to Grand River Ave and vice versa. | Fonson | 4/1 | Late August | Grand River Avenue, Napier to Wixom Road |
*Heights Road Westbound (PERMIT PROJECT) | Lapeer Road (M-24) to Odanah Street | Orion Township | Sanitary sewer and water utility work for a private development. | Yes, westbound Heights Rd will close. Residential access maintained east and west of the closure. The closure is approximately 400 feet west of Lapeer Rd. | Lapeer Rd (M-24) to Clarkston Rd to Pinetree Rd to Heights Rd to Odanah St to Kimberly Rd, back to westbound Heights Rd. | Mystic Cove Orion, LLC | 4/11 | 4/21 | Permit Work and Short-Term Road Closures |
Indianwood Road Culvert Replacement | Lapeer Road (M-24) to Joslyn Road | Orion Township | Utility relocation work, upgrades to township water and sewer infrastructure, replacement of the culvert under the road that carries Paint Creek, storm sewer improvements and asphalt paving over the vicinity of the culvert. | Yes, the road is closed between Abseguami Trl and Fernhurst Dr. | Joslyn Rd to Clarkston Rd to Lapeer Rd, back to Indianwood Rd and vice versa. | Dan's Excavating | 1/16 | 10/5 | Indianwood Road Culvert Replacement over the Paint Creek |
Pontiac Lake Road Bridge Replacement over the Clinton River | Airport Road and Crescent Lake Road (between Irwin Drive and North Pine Grove Avenue) | Waterford Township | Remove and replace the structure over the Clinton River. The project includes a new pre-cast concrete culvert, headwalls, wing walls, watermain relocation, storm sewer improvements, pedestrian access improvement and asphalt paving in the vicinity of the bridge. | Yes, Pontiac Lake Rd will close to vehicle and pedestrian traffic between Irwin Dr and North Pine Grove Ave. Pedestrian and business access maintained east and west of the bridge work. | Airport Rd to Highland Rd (M-59) to Crescent Lake Rd, back to Pontiac Lake Rd and vice versa. | Z Contractors Inc. | 6/3 | 10/18 | Pontiac Lake Road Bridge Replacement over the Clinton River |
*Preservation Overlays (Simple Resurfacing) | The work will be done on just over 46 miles of roads. | Simple resurfacing with placing 2-2.5 inches of asphalt on the road surface; the work is weather-dependent. | No, expect traffic delays. Roads are expected to remain open with flaggers directing traffic. | No. | No. | Cadillac Asphalt | April, TBA | TBA | Simple Resurfacing (Preservation Overlays) |
*Spot Resurfacing | Various heavier traveled roads throughout Oakland County. | Milling (grinding) pavement on sections of roads and paving with asphalt. The work is weather-dependent. | No, expect traffic delays, roads are expected to remain open with flaggers directing traffic. | No. | No. | Florence Cement Company | TBA | TBA | Spot Resurfacing |
Waldon Road (PHASE 2) | Just east of Montclair Drive to Clintonville Road | Independence Township and Orion Township | The remaining work includes gravel-road paving with asphalt, replacement of a culvert just east of Clintonville Rd, paving road shoulders and realignment of curves to improve safety. | Yes, Waldon Rd is closed to through traffic. | Waldon Rd to Baldwin Rd to Clintonville Rd, back to Waldon Rd and vice versa. | Dan's Excavating | 3/8 | Mid-October | Waldon Road, Clintonville to Baldwin Road |
Waldon Road and Clintonville Road roundabout construction (part of the Waldon Road-PHASE 2 project) | Waldon Road/Clintonville Road intersection | Independence Township | Construction of a roundabout at the Waldon Road/Clintonville Road intersection, asphalt paving, culvert replacement and stream realignment. | Yes, starting approximately July 1. | Waldon Rd to Baldwin Rd to Maybee Rd to Sashabaw Rd to Clarkston Rd, back to Clintonville Rd and vice versa. | Dan's Excavating | 7/1 (expected start) | Mid-October | Waldon Road, Clintonville to Baldwin Road |
*Walton Blvd. | Adams Road to just east of Livernois Road | Rochester Hills | Removing pavement, paving with asphalt, culvert replacement, minor storm sewer improvements, Americans with Disabilities Act-compliant sidewalk ramps, concrete curb and gutter repairs. | No, the road will have one lane open in each direction throughout construction. Business and residential access maintained. | No. | Pro-Line Asphalt | 4/15 | Mid-August | Walton Blvd., Adams to Livernois Road |