10 Mile Road | Telegraph Road/US 24 to Lahser Road | Southfield | Resurfacing project, reconstruction of side street approaches, drainage work, ADA-compliant crosswalks, traffic-signal upgrade at the Berg Rd/10 Mile Rd intersection, curb/gutter replacements, new signage and pavement markings. | No, expect lane closures and traffic delays during the work. | No. | Cadillac Asphalt | 4/16 | Late June for paving completion. Traffic signal work at Berg Rd/10 Mile Rd intersection will continue until mid-Nov. | 10 Mile Road, Lahser Road to Telegraph Road |
10 Mile Road (PERMIT WORK) | Westbound 10 Mile Road, Woodward Avenue/M-1 to Scotia Road | Huntington Woods, Oak Park and Pleasant Ridge | Oakland County Water Resources Commissioner's Office (OCWRC) sanitary sewer work. | Yes, westbound 10 Mile Road is closed to through traffic. Business access maintained by using eastbound 10 Mile Road by using freeway crossovers. | Woodward Ave to westbound I-696. | OCWRC | 1/13 | Late Apr. | Oakland County Water Resources Commissioner |
12 Mile Road | Inkster Road to Autumn Ridge Road (just east of Middlebelt Road) | Farmington Hills | Milling (grinding) existing pavement, asphalt paving, adding a continuous center left-turn lane, curb/gutter reconstruction, side street/driveway approach reconstruction, ADA-compliant ramps, drainage improvements and traffic-signal upgrades. | Yes, the road will close to eastbound traffic. Westbound traffic will be maintained. The Inkster Rd/12 Mile Rd intersection will close in two phases. Dates and detours will be announced. | Eastbound traffic detour is Middlebelt Rd to 13 Mile Rd to Northwestern Hwy, back to 12 Mile Rd. | M.L. Chartier | 4/14 | Early Oct. | 12 Mile Road, Inkster Road to Autumn Ridge Road |
12 Mile Road | Northwestern Highway/M-10 to Telegraph Road/US 24 | Southfield | Resurfacing project, improvements to side street approaches, drainage work, ADA-compliant crosswalks, traffic-signal upgrades, concrete repairs, curb/gutter replacements, new signage and pavement markings. | One lane in each direction is open to traffic. Business and side street access maintained. | No. | Dan's Excavating | 4/7 | Late summer | 12 Mile Road, Northwestern Hwy. to Telegraph Rd. |
Dequindre Road (PERMIT PROJECT) | 23 Mile Road to 24 Mile Road/Parkdale Road | Rochester, Rochester Hills and Shelby Township | Great Lakes Water Authority (GLWA) 96-inch water transmission pipe installation that includes reconstruction of Dequindre Road. | Yes, the road is closed. | 23 Mile Rd east to Shelby Rd to 24 Mile Rd, back to Dequindre Rd and vice versa. | Ric-Man on behalf of GLWA | 11/28/24 | Mid-Nov. | GLWA 96-inch Water Transmission Line Relocation |
*John R Road | Dartmouth Street (north of 12 Mile Road) to 14 Mile Road | Madison Heights | Resurfacing project, improvements to side street and driveway approaches, drainage work, ADA-compliant sidewalk ramps, traffic-signal upgrades at John R/Ajax and John R/Irving intersections, drainage improvements and curb/gutter repairs. | One lane in each direction will remain open during the work. Business access will be maintained. | No. | Pro-Line Asphalt | TBA | TBA | John R, Dartmouth to 14 Mile Road |
Martindale Road bridge over the Novi-Lyon Drain (BRIDGE REPLACEMENT) | Pontiac Trail and 12 Mile Road | Lyon Township | The bridge was closed on Aug. 24, 2024, due to deterioration and will be replaced in 2025. | Yes, the road is closed over the Novi-Lyon Drain. Residential access maintained north and south of the bridge. | Pontiac Trl west to Pontiac Trl south to 11 Mile Rd east, back to Martindale Rd and vice versa. | Dan's Excavating | TBA | TBA | Martindale Road Bridge over the Novi-Lyon Drain |
*Orchard Lake Road | Will-O-Way Lane (north of Walnut Lake Road) to Long Lake Road | City of Orchard Lake Village and West Bloomfield Township | Resurfacing project, improvements to side street and driveway approaches, ADA-compliant sidewalk ramps, traffic-signal upgrades, drainage improvements, curb/gutter repairs, new signage and lane markings. | One lane in each direction will remain open during the work. Business access will be maintained. | No. | Pro-Line Asphalt | TBA | TBA | Orchard Lake Road, Will-O-Way to Long Lake Road |
Spaulding Road bridge over the Novi-Lyon Drain (BRIDGE REPLACEMENT) | Just north of 11 Mile Road | Lyon Township | The bridge was closed on Nov. 18, 2024, due to deterioration and will be replaced in 2025. | Yes, the road is closed over the Novi-Lyon Drain. Residential access maintained north and south of the bridge. | 11 Mile Rd to Pontiac Trl to 12 Mile Rd, back to Spaulding Rd and vice versa. | Dan's Excavating | TBA | TBA | Spaulding Road Bridge over the Novi-Lyon Drain |