GREAT LAKES WATER AUTHORITY (GLWA) PHASE TWO (2022-23) CONSTRUCTION INFORMATION
START DATE: Dec. 5, 2022
END DATE: Mid-August, 2023
ROAD CLOSURE: Yes, East Avon Road will close between Avon Road and Dequindre Road starting December 5. The detour is Dequindre Road to Hamlin Road to Ryan Road to 23 Mile Road, back to Dequindre Road and vice versa. The work is being done under a permit issued by the RCOC.
Great Lakes Water Authority Nov. 28 press release
GLWA Project information: https://www.glwater.org/96inchwatermain/
Phase two of the Avon Road infrastructure improvements also includes:
- Installation of 2,200 linear feet of 96-inch diameter welded steel pipe, starting on Dequindre Road south of the Clinton River, crossing the Clinton River into Yates Cider Mill property, and traversing along East Avon Road to 23 Mile Road, terminating at Dequindre Road approximately 300 feet north of 23 Mile Road;
- Reconstruction and widening of East Avon Road;
- Construction of a roundabout at the intersection of Dequindre and 23 Mile Road;
The replacement of the 61-inch-high by 84-inch-wide corrugated metal pipe (structural plate arch) culvert at the Yates mill race.
Further details of the GLWA project can be found online at glwater.org/96inchwatermain or calling 877-237-7311.