Completed Road Projects
-
12 Mile Rd.
Concrete slab replacement on 12 Mile Rd. between Haggerty and Farmington.
-
12 Mile Rd. Bridges in Southfield
Bridge Maintenance of 12 Mile Road over Rouge River in Southfield.
-
Adams Road
Adams Road will undergo a repair, rehabilitate and resurface process in 2018, from Square Lake Road to South Boulevard in Bloomfield Township and the city of Troy
-
Dequindre Road (2017-2018)
Construction is scheduled for Dequindre Road. The project limits are Long Lake Road to Burningbush Drive in Troy/Sterling Heights. Construction began on March 5, 2018 and is expected to conclude late fall. The road will remain open to two-way traffic throughout the project.
-
Flint, Miller and Orion Road Roundabout
Flint, Miller and Orion Road intersection will undergo safety improvements in 2018 in the Village of Lake Orion and Orion Township. A roundabout will be built in 2018 requiring a complete closure of the intersection.
-
Hamlin Road
Hamlin Road will undergo a reconstruct in 2018, just west of Adams Road. City of Rochester Hills, through a partnership, is repairing Hamilin Road. RCOC jurisdiction of Hamilin Road between Old Adams Road and Adams Road was switched to the City of Rochester Hills on 11/29/18.
-
Lahser Road
Construction is scheduled for Lahser Road. The project limits will be 11 Mile Road to Civic Center Drive in Southfield. Lahser will close to traffic from NW Hwy to Civic Center Driver beginning July 26 through mid-September for reconstruction.
-
Lansdowne Road Bridge
Landsowne Road will undergo bridge preventative maintenance in 2018, over Williams Lake Canal in Waterford Township
-
Livernois Road
Livernois Road between Big Beaver and Maple roads in the City of Troy is scheduled for construction in 2018. Concrete repair work will be done section between the I-75 overpass and Big Beaver Road. Resurfacing work will be done from the I-75 overpass to Maple Road. Road will remain open to traffic with lane restrictions. Work will begin August 7 and conclude mid-September.
-
Livernois Road Culvert
Culvert Project on Livernois Road. Over the Gibson Drain in Troy.
-
Long Lake Road at Telegraph
West Long Lake Road concrete approaches at Telegraph Road (US 24) in Bloomfield Township will be removed and replaced with asphalt.
-
Manor Road Bridge
Manor Road will undergo bridge preventative maintenance in 2018, over the Rouge River in Bloomfield Township.
-
Maple Road - Orchard Lake to Farmington
WEST BLOOMFIELD TOWNSHIP Resurfacing and adding a continuous left-turn center lane on Maple Road from Drake Road to Orchard Lake Road in West Bloomfield Township will take place over a two-year period. First phase, from Drake to Farmington, was completed in 2016. The second phase began April 3, 2017 and expected to be complete late-July of 2017. Westbound Maple Road remains open to traffic. Eastbound Maple is closed and the detour is Drake Road to Walnut Road to Orchard Lake Road, back to Maple Road.
-
Maple Road (Phase 2/Halsted to Drake)
RCOC began resurfacing a two-mile section of Maple Road in 2017. Phase 1 from Halsted to Haggerty is complete and reopened to traffic on November 22, 2017 (8 days ahead of schedule) . Phase 2 from Halsted to Drake began on April 9, 2018. Halsted Road at Maple Road has scheduled closures for intersection improvements. Click on project for more information.
-
Middlebelt Road Bridge
Bridge Maintenance Project of the Middlebelt Road Bridge over the rouge river. Project is between 8 Mile Road and Grand River Avenue in Farmington Hills
-
Napier Road-9 to 10 Mile (Phase 2)
Paving of Napier Road from 9 Mile to 10 Mile Road started on April 9, 2018 and is expected to conclude mid-July. The road is closed to through traffic. Last year, the RCOC completed the construction of a roundabout at the Napier/10 Mile Road intersection as part of the project.
-
Orchard Lake Road
Orchard Lake Road from just north of 14 Mile Road to just south of Maple Road is under construction and expected to be substantially complete early December of 2017.
-
Pine Tree Road
Pine Tree Road from Clarkston Road to Heights Road in Orion Township is scheduled for rehabilitation work in 2018.
-
Secord Lake Road Bridge
Secord Lake Road will undergo bridge preventative maintenance in 2018, over East Creek in Addison Township.
-
Snell Road Culvert
Culvert Project on Snell Road. Over the McClure Drain (just west of Dequindre Road) in Oakland Township.
-
South Boulevard
South Boulevard will undergo a repair, rehabilitate and resurface project in 2018, from Adams Road to Crooks Road in the cities of Rochester Hills and Troy.
-
South Boulevard
Intersection Safety Improvement project for South Boulevard at Livernois Road in Rochester Hills and Troy.
-
South Blvd. Over Ferry Drain
Culvert Project at South Boulevard. Over the Ferry Creek which is just west of John R Road in Rochester Hills.
-
Tripp Road
Tripp Road will be reconstructed in 2018 from Dixie Highway to Van Road (including culvert replacement) in Groveland Township.
-
Wixom Road Bridge over Huron River
Wixom Road will undergo a bridge replacement project in 2018, over the Huron River in Commerce Township.The culverts that carry the Huron River under the bridge were constructed in 1954.