Completed Road Projects
-
8 Mile Road over the Rouge River 2019
Preventative Maintenance of the 8 Mile Bridge over the Rouge River in the cities of Farmington Hills and Livonia.
-
10 Mile Road 2019
In 2019, the Road Commission for Oakland County will concrete patch 10 Mile Road from Evergreen to Greenfield in the City of Southfield.
-
12 Mile Rd. 2017
Concrete slab replacement on 12 Mile Rd. between Haggerty and Farmington.
-
12 Mile Road, Greenfield to Coolidge 2020
In 2020, 12 Mile Road from Greenfield to Coolidge Hwy was resurfaced.
-
12 Mile Road, Lahser to Telegraph 2020
In 2020, 12 Mile Road from Lahser to Telegraph was resurfaced.
-
12 Mile/Novi Road Intersection 2019
12 Mile and Novi Road intersection is scheduled for concrete replacement in 2019.
-
12 Mile Rd. Bridges in Southfield 2017
Bridge Maintenance of 12 Mile Road over Rouge River in Southfield.
-
Adams Road Bridges 2019
-
Adams Road 2018
Adams Road will undergo a repair, rehabilitate and resurface process in 2018, from Square Lake Road to South Boulevard in Bloomfield Township and the city of Troy
-
Adams/Gunn Road Roundabout 2019
Adams Road will undergo intersection safety improvements in 2019, at the intersection of Adams Road and Gunn Road in Oakland Township. The project is expected to start once school is breaks for the summer in 2019. The intersection will be completely closed during construction.
-
Baldwin Road 2017-2020
In 2020, reconstruction on Baldwin Road from north of I-75 to Waldon Road. Construction began in 2017 and the road fully opened to traffic in 2020. Five roundabouts were constructed as part of the project located in Orion Township. Behind the curb restoration and work on the township's water fountain located at the Great Lakes Athletic Center and Baldwin Road will continue in 2021.
-
Carroll Lake Road at Cooley Lake Road 2019
Roundabout construction at the Carroll Lake Road and Cooley Lake Road intersection in Commerce Township.
-
Central Drive 2019
-
Cooley Lake Road Culvert Replacement 2020
Cooley Lake Road culvert over Teeple Creek just east of Duck Lake Road was replaced in 2020.
-
Davisburg Road Culvert Replacement 2020
Davisburg Road culvert just west of Orion Road was replaced in 2020.
-
Dequindre Road (2017-2018)
Construction is scheduled for Dequindre Road. The project limits are Long Lake Road to Burningbush Drive in Troy/Sterling Heights. Construction began on March 5, 2018 and is expected to conclude late fall. The road will remain open to two-way traffic throughout the project.
-
Dequindre Road (Utica to Collins) 2020
In 2020, Dequindre Road from Utica Road to Collins Avenue was reconstructed.
-
Dixboro Road 2019-2020
Dixboro Road from 8 Mile to 9 Mile Road gravel road paving project was done in 2019-2020.
-
Flint, Miller and Orion Road Roundabout 2018
Flint, Miller and Orion Road intersection will undergo safety improvements in 2018 in the Village of Lake Orion and Orion Township. A roundabout will be built in 2018 requiring a complete closure of the intersection.
-
Grand River Ave. Bridge over CSX Railroad 2020
In 2020, concrete repairs were done on the Grand River Ave. bridge over CSX railroad. Work was done on the sidewalks and barrier walls.
-
Grand River Avenue at South Hill 2019
Intersection Safety Improvement project for Grand River Avenue at South Hill Road, in Lyon Township
-
Grass Lake Road 2020
Grass Lake Road from Ormond Road to Steeple Hill gravel road paving project was completed in 2020.
-
Haggerty Road Culvert Replacement 2019
Haggerty Road will undergo culvert replace in 2019, over the Seeley Drain in the cities of Farmington Hills and Novi.
-
Hamlin Road 2018
Hamlin Road will undergo a reconstruct in 2018, just west of Adams Road. City of Rochester Hills, through a partnership, is repairing Hamilin Road. RCOC jurisdiction of Hamilin Road between Old Adams Road and Adams Road was switched to the City of Rochester Hills on 11/29/18.
-
Holly Road 2020
North Holly Road from Grange Hall Road to the northern Oakland County border was resurfaced with major drainage improvements in 2020. The work was mostly funded by a federal TIGER grant.
-
John R 2019
In 2019, John R from Square Lake to South Blvd was reconstructed. Behind the curb restoration of grass continued in 2020.
-
Lahser Road 2017
Construction is scheduled for Lahser Road. The project limits will be 11 Mile Road to Civic Center Drive in Southfield. Lahser will close to traffic from NW Hwy to Civic Center Driver beginning July 26 through mid-September for reconstruction.
-
Lake George Road Culvert Replacement 2019
Lake George Road will undergo a culvert replacement in 2019 over Stoney Creek in Oakland Township.
-
Lansdowne Road Bridge 2018
Landsowne Road will undergo bridge preventative maintenance in 2018, over Williams Lake Canal in Waterford Township
-
Livernois Road 2018
Livernois Road between Big Beaver and Maple roads in the City of Troy is scheduled for construction in 2018. Concrete repair work will be done section between the I-75 overpass and Big Beaver Road. Resurfacing work will be done from the I-75 overpass to Maple Road. Road will remain open to traffic with lane restrictions. Work will begin August 7 and conclude mid-September.
-
Livernois Road 2019
The reconstruction of Livernois Road from Avon Road to just north of Walton Road in the city of Rochester Hills.
-
Livernois Road Culvert 2017
Culvert Project on Livernois Road. Over the Gibson Drain in Troy.
-
Long Lake Road at Telegraph 2018
West Long Lake Road concrete approaches at Telegraph Road (US 24) in Bloomfield Township will be removed and replaced with asphalt.
-
Orchard Lake Road 2017
Orchard Lake Road from just north of 14 Mile Road to just south of Maple Road is under construction and expected to be substantially complete early December of 2017.
-
Manor Road Bridge 2018
Manor Road will undergo bridge preventative maintenance in 2018, over the Rouge River in Bloomfield Township.
-
Maple Road - Orchard Lake to Farmington 2017
WEST BLOOMFIELD TOWNSHIP Resurfacing and adding a continuous left-turn center lane on Maple Road from Drake Road to Orchard Lake Road in West Bloomfield Township will take place over a two-year period. First phase, from Drake to Farmington, was completed in 2016. The second phase began April 3, 2017 and expected to be complete late-July of 2017. Westbound Maple Road remains open to traffic. Eastbound Maple is closed and the detour is Drake Road to Walnut Road to Orchard Lake Road, back to Maple Road.
-
Maple Road (Phase 2/Halsted to Drake) 2018
RCOC began resurfacing a two-mile section of Maple Road in 2017. Phase 1 from Halsted to Haggerty is complete and reopened to traffic on November 22, 2017 (8 days ahead of schedule) . Phase 2 from Halsted to Drake began on April 9, 2018. Halsted Road at Maple Road has scheduled closures for intersection improvements. Click on project for more information.
-
Maple/Middlebelt Road Roundabout 2019-2020
Maple/Middlebelt Road roundabout was constructed in 2019-2020. The project included a culvert replacement on Maple Road just east of Middlebelt Road.
-
Mason Street 2019
Rose Township through Tri-Party funding provided by Oakland County general government will pave Mason Street from Milford Road to Franklin Street beginning May 28, 2019. Road will close to through traffic; however, residential and township hall traffic will be maintained.
-
Middlebelt Road Bridge 2017
Bridge Maintenance Project of the Middlebelt Road Bridge over the rouge river. Project is between 8 Mile Road and Grand River Avenue in Farmington Hills
-
Milford Road Culvert Replacement 2019
In 2019, the Milford Road culvert that carries the Shiawassee River in Rose Township will be replaced. In 2018, Milford Road was part of the Preservation Overlay program. The section over the culvert will be resurfaced this year.
-
Napier Road-9 to 10 Mile 2018
Paving of Napier Road from 9 Mile to 10 Mile Road started on April 9, 2018 and is expected to conclude mid-July. The road is closed to through traffic. Last year, the RCOC completed the construction of a roundabout at the Napier/10 Mile Road intersection as part of the project.
-
Opdyke Road Bridge 2019
Opdyke Road will undergo a repair, rehabilitate and resurface project in 2018, from Auburn Road to Perry Street/Lapeer Road (M-24) in the cities of Auburn Hills and Pontiac. The bridge over the Clinton River will also be reconstructed.
-
Sashabaw Road (Sherwood to Granger Road) 2019
In 2019, Sashabaw Road from Sherwood Road to Granger Road in Brandon Township will be paved. The road is currently gravel. Improvements also include some shoulder paving, improved drainage and storm sewer installation.
-
Pine Tree Road 2018
Pine Tree Road from Clarkston Road to Heights Road in Orion Township is scheduled for rehabilitation work in 2018.
-
Sashabaw Road (Bow Pointe to Sheffler) 2019
In 2019, Sashabaw Road between Bow Pointe and Sheffler drives will have improvements to the crossovers, sidewalks, new pavement markings and Americans with Disabilities Act (ADA) compliant ramps The project is mostly funded by a grant secured through the State of Michigan's Transportation Economic Development Fund (TEDF).
-
Sashabaw Road Culvert 2020
In 2020, the culvert under Sashabaw Road just south of Pine Knob Road was removed and replaced.
-
Sashabaw Road (I-75 to Clarkston Road) 2019
This page has the details of the Sashabaw Road construction project.
-
Pickering Road Culvert Replacements 2020
In 2020, three culverts were removed and replaced on Pickering Road.
-
Secord Lake Road Bridge 2018
Secord Lake Road will undergo bridge preventative maintenance in 2018, over East Creek in Addison Township.
-
Simple Resurfacing (Preservation Overlays) 2017-20
Preservation overlays, commonly known as simple resurfacing, consists of placing 2 inches to 2.5 inches of asphalt on the surface of a road. This technique is done on heavier traveled roads that are considered in moderately good shape. Preservation overlay extends the life of the road until there is a longer term project such as reconstruction or resurfacing with extensive work done on the road's base. The projects are either funded federally or by the RCOC through local dollars.
-
Snell Road Culvert 2017
Culvert Project on Snell Road. Over the McClure Drain (just west of Dequindre Road) in Oakland Township.
-
South Boulevard 2018
South Boulevard will undergo a repair, rehabilitate and resurface project in 2018, from Adams Road to Crooks Road in the cities of Rochester Hills and Troy.
-
South Boulevard 2017
Intersection Safety Improvement project for South Boulevard at Livernois Road in Rochester Hills and Troy.
-
South Blvd. Over Ferry Drain 2018
Culvert Project at South Boulevard. Over the Ferry Creek which is just west of John R Road in Rochester Hills.
-
Square Lake Road Culvert 2020
In 2020, the culvert under Square Lake Road between Opdyke and Squirrel roads was removed and replaced.
-
Wixom Road Bridge over Huron River 2018
Wixom Road will undergo a bridge replacement project in 2018, over the Huron River in Commerce Township.The culverts that carry the Huron River under the bridge were constructed in 1954.
-
Tripp Road 2018
Tripp Road will be reconstructed in 2018 from Dixie Highway to Van Road (including culvert replacement) in Groveland Township.
-
Walton Blvd 2019
Walton Blvd culverts between Squirrel and Adams Road in the communities of Rochester Hills and Auburn Hills were replaced in 2018. Resurfacing to take place in the Spring of 2019.
-
Wise Road Culvert Replacement 2020
In 2020, the culvert under Wise Road west of Union Lake Road was removed and replaced.