Walton Blvd Culverts (2018-2019)

  • Road: Walton Blvd.
  • Project limits:  Squirrel Road and Adams Road
  • Communities:  Auburn Hills and Rochester Hills
  • Comments:   
    • Three culverts will be replaced will be replaced with box culverts
    • Concrete curbs and gutter repairs
    • Resurfacing
  • Contractor:  Z. Contractors
  • Start date:  May 14, 2018
  • End date:   Late fall.   Walton Blvd will fully reopen to traffic during the winter, median work will continue until project is shut down for winter; date TBA.   (resurfacing work will take place in the spring of 2019) 
  • Detour:  No (two-way traffic will be maintained on half of the boulevard throughout construction) Walton Blvd entrances to Firewood and Bellarmine drives will close for the duration of the project on June 2.   Bellearmine and Firewood subdivision entrances are open at Walton Blvd.   The outside (right) lane on each side of the boulevard is open to traffic with most crossover accessible.  
  • Public meeting: Public meeting is scheduled for April 26, 2018 from 4 p.m. to 7 p.m. at the Auburn Hills Public Library, 3400 East Seyburn Drive, Auburn Hills, MI  48326  
  • WALTON BLVD PHOTO ALBUM:   CLICK HERE

Additional Information:

Walton Blvd Traffic Shift Expected June 2

Photo Gallery: Walton Blvd. Culvert Replacements

Walton Blvd Public Meeting scheduled for April 26

Walton Blvd Project Information Flier

Oakland Press article on Walton Blvd Public Meeting (4/4/18)

Walton Blvd Culverts Press Release


Walton Blvd. Culvert (18)


IMG_3124


DJI_0001